What was the project?
Over eight months, the roof of Boughton House’s North Range and West Pavilion was carefully repaired – a vital undertaking that has helped ensure this Grade I listed building remains wind and watertight for generations to come. The work has safeguarded both the historic structure and the internationally celebrated Buccleuch collection within.
In keeping with the House’s architectural integrity, thousands of reclaimed Collyweston slates were used, preserving the original character and distinctive silhouette of this iconic landmark. Structural repairs also addressed centuries-old oak damaged by woodworm, alongside sensitive stonework, re-pointing and essential leadwork. Together, these measures have strengthened the building fabric and helped secure the long-term future of the House.
The Roof Restoration: A Journey from Start to Finish
Watch the complete film, following the roof restoration project from its early stages through to completion. The film offers an insight into why the work was necessary, the different stages of the project and some of the specialist craftsmanship involved. Along the way, hear from key members of the Boughton team and the skilled contractors who helped bring this significant restoration project to completion, as well as getting a closer look at the work itself.
Why was the roof repair important?
The work on the roof was about more than practical repair – it was an act of guardianship for one of Britain’s most remarkable historic homes. With origins dating to before 1528, Boughton embodies both Tudor heritage and late 17th-century grandeur, with much of its character remaining untouched since the Montagu and Buccleuch families joined in the 18th century.
The condition of the roof was directly linked to safeguarding the treasures beneath it, from the State Rooms with their ornate panelling to the newly restored Louis Chéron ceilings. The only surviving examples of his work in Britain, these nine Baroque masterpieces, alive with mythological scenes, are irreplaceable cultural artefacts of international importance. Without a sound, weatherproof roof, such interiors – and the priceless Buccleuch collection – would have remained vulnerable to damage.
What were the challenges?
The North Range roof had come under increasing strain from water ingress, making repairs to its slate and lead coverings essential. To preserve its historic character, the entire surface was re-slated in Collyweston slate – made possible only after years of sourcing enough reclaimed material of the right quality.
Structural repairs were carried out using oak from the Estate’s own woodland, milled and crafted on site, ensuring sustainability while maintaining continuity with traditional methods. To protect the Chéron ceilings below, a breathable membrane was also installed, providing a discreet but vital defence against moisture.


How did this happen?

Late September/Early October 2025
The first stage of Boughton’s roof restoration got underway with scaffolding rising around the House.
More than simply marking the beginning of the project, the scaffolding provided the safe access needed for the team to carry out these essential repairs, allowing work to begin across the roof.

14 October 2025
As part of our commitment to heritage conservation, members of the Boughton team visited Collyweston Mine – the only working Collyweston slate mine today – to learn more about the traditional craft and the methods used to produce the slate.
The visit provided a valuable insight into the craftsmanship behind one of the key materials used in Boughton’s roof restoration, and the importance of preserving these traditional skills for the future.
Read more about the visit and how it supported Boughton’s roof restoration project.
Timelapse of Early Stages
Catch a glimpse of the first stages of the Roof Restoration, as captured by our timelapse camera from September through to December 2025.
Preparing for Restoration...




Half-Way Update
As of February 2026, our roof restoration project reached the halfway point.
In this video, take a closer look from the grounds to see what was happening beneath the scaffolding, hear from our team, and watch skilled craftsmen at work onsite.
Nearing Completion...
From spring through to summer, the final stages of the project saw the remaining restoration work carefully completed, with the scaffolding eventually coming down to reveal the renewed roofline of Boughton House once again.
What began as an essential programme of repair has been an important investment in the long-term care of the House, using traditional materials and skilled craftsmanship to respect its historic character. Most importantly, the work ensures that Boughton can continue to be cared for and enjoyed for generations to come – preserving not only the building itself, but the remarkable collections and stories held within it.
Project Complete!
In summer 2026, the Roof Restoration Project reached completion following months of careful work. In the final instalment of our video series, Building Operations Manager Matthew Curwen and Estate Manager Sam Rees reflect on the project, its importance, and the work involved in securing the future of Boughton House for generations to come.
Up next
Plan A Visit
Group Visits
School Visits
Boughton House
The Buccleuch Collection
Previous Exhibitions
House Tours
Montagu Monuments
The Stableyard
Simulated Game Days
Our Sister Estates
The History of the Gardens
Orpheus – the 21st Century Garden
Grand Etang Restoration Project
Through the Seasons
Boughton Estate
Simulated Game Days
Boughton Firewood
Contact
Work For Us